#fedora-meeting: Fedora QA meeting

Meeting started by adamw at 15:01:45 UTC (full logs).

Meeting summary

  1. Roll Call (adamw, 15:01:53)
  2. Previous meeting follow-up (adamw, 15:09:03)
    1. "sumantro to check in with design team and make sure wallpapers will be available in time for Beta and Final" - sumantro says he did this, and they promised they'll be in shape this time (adamw, 15:10:47)
    2. "sumantro to send out reminder about LxQT test day" - he did that, and the event has concluded (adamw, 15:11:23)
    3. "sumantro to contact i18n team to make sure their regular test days are being planned, and atomic/cloud team" - he definitely checked in with g11n team and they're on the same page, not sure about atomic/cloud (adamw, 15:11:50)

  3. Fedora 27 status (adamw, 15:18:53)
    1. Beta freeze is at 00:00 UTC tonight (00:00 on 2017-09-05) (adamw, 15:19:26)
    2. currently composes are succeeding, but with one major bug - https://bugzilla.redhat.com/show_bug.cgi?id=1487856 prevents all UEFI installs from booting properly - and several other blocker bugs (e.g. FreeIPA issues) (adamw, 15:20:32)
    3. further testing beyond openQA may have been hampered by the frequent compose failures and broken composes till now (adamw, 15:21:57)
    4. for now, the planned schedule still holds, which means we need to do a lot of testing to get up to the Beta criteria by Beta go/no-go on 2017-09-14 (adamw, 15:22:43)
    5. https://bugzilla.redhat.com/show_bug.cgi?id=1483667 (dominicpg, 15:31:31)

  4. Kernel rebase testing plan (adamw, 15:41:18)
    1. new upstream kernel releases are pushed into stable Fedora releases, at present. This can be a source of regressions (adamw, 15:42:10)
    2. Plan is to run a Test Day event for each new kernel release to try and identify and fix problems before they get out into the stable releases (adamw, 15:42:42)
    3. sumantro will be co-ordinating this with the kernel team, the Test Day will involve running the kernel test suite (see https://fedoraproject.org/wiki/KernelTestingInitiative ) and generally checking for issues (adamw, 15:43:33)

  5. Activity meeting plan (adamw, 15:47:26)
    1. sumantro says that many of the newer folks he's mentoring see this meeting as more of an administrative/discussion meeting, and don't really want to jump in with practical questions etc. (adamw, 15:48:07)
    2. so he proposes having a regular meeting (I think the idea was monthly) focused on practical testing activity, selecting specific things that need testing at the time and focusing on those (adamw, 15:49:02)

  6. Open floor (adamw, 15:53:41)
    1. Heroes of Fedora 26 is not done yet, sumantro should be working on it soon (adamw, 15:56:14)


Meeting ended at 16:01:07 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. adamw (93)
  2. dominicpg (19)
  3. tenk (14)
  4. kparal (12)
  5. zodbot (5)
  6. alciregi (5)


Generated by MeetBot 0.1.4.