*Note: This summary is AI-generated and has not been validated by the attendants, it may be incorrect.*

### Key Discussion Points
*   **Ticket #12956 (netapp storage for distgit stg/prod):** The team discussed the storage request. `nirik` questioned if the 100GB planned for production would be sufficient if it's meant to hold git repositories in addition to the forge database and files.
*   **Proxy Updates:** `phsmoura` is working on identifying which proxies have been updated to Fedora 42 after losing his notes in a `gnote` bug. `james` pointed him to a command on `batcave` to help with this.
*   **Upcoming Outages/Moves:**
    *   `pagure.io` will have an outage tomorrow for a migration.
    *   A datacenter move is scheduled for next Monday.
*   **Pagure Migration Plan:**
    *   `nirik` is preparing to move `stg.pagure.io` by syncing data to a new host (`pagure-stg02` in rdu3), after which he will stop the old one, do a final sync, and switch the DNS.
    *   The same process will be followed for the production `pagure.io` migration tomorrow.
    *   It was clarified that `pagure-stg` is in a special isolated VLAN for security reasons, not in the main staging network.

### Action Items
*   **nirik:** Move `stg.pagure.io` to the new host in rdu3.
*   **nirik:** Proceed with the `pagure.io` production migration tomorrow.
*   **nirik:** Catch up on a backlog of emails, issues, and pull requests.
*   **phsmoura:** Continue checking the status of proxies updated to Fedora 42.