#fedora-meeting: Fedora QA Meeting
Meeting started by adamw at 16:01:03 UTC
(full logs).
Meeting summary
- Roll call (adamw, 16:01:10)
- Previous meeting follow-up (adamw, 16:05:12)
- "kparal to reply to the list with his
suggestions for revisions to the proposed shutdown test case" - he
did this, and we'll be coming back to the topic later (adamw,
16:06:18)
- "tablepc to do a new draft of the proposed test
case after seeing kparal's suggestions" - this also happened, and
once again we'll be coming back to it (adamw,
16:06:39)
- Proposed asynchronous blocker review process (adamw, 16:11:21)
- AGREED: there is a
solid consensus that the async blocker process proposal is a good
idea and we should go ahead and give it a shot (adamw,
16:19:26)
- ACTION: kparal to go
ahead and set up some version of the proposed process for a trial
run for early f32 review (adamw,
16:20:05)
- Proposed disk unmount test case (adamw, 16:22:17)
- https://fedoraproject.org/wiki/User:Tablepc/Draft_testcase_reboot
(tablepc,
16:22:26)
- ACTION: adamw to send
a reboot test case draft with some copyediting corrections to
tablepc's draft (adamw,
16:31:21)
- F31 eclipse module default stream / protobuf issue (adamw, 16:39:02)
- late last week, the eclipse module was given a
'default stream' for F31; this means that module stream was now the
default source for all packages it contains, rather than the
non-modular repos (adamw,
16:42:45)
- it turned out the module included a build of
the protobuf package, with some features removed; so now we had a
reduced-functionality protobuf as the default. this caused problems
for folks who had anything that required the missing bits of
protobuf installed (adamw,
16:43:47)
- the default stream was quickly removed again,
but the current implementation of modularity doesn't handle the
removal of a default stream automatically - anyone who updated while
it was set and got the module stream enabled is stuck with it until
they deactivate the module manually (adamw,
16:45:09)
- the official recommendation from modularity
team is to run `dnf module disable eclipse` followed by `dnf
downgrade protobuf` (adamw,
16:46:50)
- Open floor (adamw, 16:56:15)
Meeting ended at 17:07:49 UTC
(full logs).
Action items
- kparal to go ahead and set up some version of the proposed process for a trial run for early f32 review
- adamw to send a reboot test case draft with some copyediting corrections to tablepc's draft
Action items, by person
- adamw
- adamw to send a reboot test case draft with some copyediting corrections to tablepc's draft
- tablepc
- adamw to send a reboot test case draft with some copyediting corrections to tablepc's draft
People present (lines said)
- adamw (82)
- cmurf (24)
- lruzicka (23)
- tablepc (23)
- zodbot (10)
- coremodule (5)
- frantisekz (4)
- Southern_Gentlem (3)
- tflink (2)
Generated by MeetBot 0.1.4.