#fedora-meeting-1: Infrastructure (2019-05-30)

Meeting started by smooge at 15:04:43 UTC (full logs).

Meeting summary

  1. aloha (smooge, 15:04:43)
  2. New folks introductions (smooge, 15:06:19)
    1. This is a place where people who are interested in Fedora Infrastructure can introduce themselves (smooge, 15:06:19)
    2. Getting Started Guide: https://fedoraproject.org/wiki/Infrastructure/GettingStarted (smooge, 15:06:19)

  3. announcements and information (smooge, 15:07:17)
    1. bowlofeggs will be going on extended leave in June (smooge, 15:07:18)
    2. nirik will be on leave from 2019-06-03 to 2019-06-07 (smooge, 15:07:18)
    3. many people will be at a community platform engineering f2f 2019-06-10 to 14 (smooge, 15:07:18)
    4. Flock2Fedora 2019-08-08 -> 2019-08-11 (smooge, 15:07:18)
    5. bodhi 4.0.0 was deployed to production. There is a known incompatibility between the bodhi 3 client and bodhi 4 server: https://pagure.io/fesco/issue/2137 (smooge, 15:07:19)
    6. cverna will be going on extended leave in June too :) (cverna, 15:08:50)
    7. broke up the s3 mirror sync into a bunch of smaller syncs and we've gone from 48 hours per sync to about ~5 minutes per individual portion synced. (relrod, 15:11:20)

  4. Oncall (smooge, 15:13:44)
    1. https://fedoraproject.org/wiki/Infrastructure/Oncall (smooge, 15:13:44)
    2. relrod is on call from 2019-05-23 -> 2019-05-30 (smooge, 15:13:44)
    3. smooge is on call from 2019-05-30 -> 2019-06-06 (smooge, 15:13:44)
    4. no one is on call from 2019-06-06 -> 2019-06-20 (smooge, 15:13:45)
    5. pingou is on call from 2019-06-20 -> 2019-06-27 (smooge, 15:13:47)
    6. Summary of last week: (from relrod ) (smooge, 15:13:49)

  5. Monitoring discussion (smooge, 15:16:28)
    1. https://nagios.fedoraproject.org/nagios (smooge, 15:16:28)
    2. Go over existing out items and fix (smooge, 15:16:28)

  6. Tickets discussion (smooge, 15:25:49)
    1. https://pagure.io/fedora-infrastructure/report/Meetings%20ticket (smooge, 15:25:50)
    2. https://pagure.io/fedora-infrastructure/issue/7855 (cverna, 15:27:38)

  7. Open Floor (smooge, 15:36:57)


Meeting ended at 15:43:43 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. smooge (50)
  2. nirik (19)
  3. cverna (14)
  4. zodbot (14)
  5. relrod (8)
  6. mkonecny (5)
  7. bowlofeggs (4)
  8. mizdebsk (2)
  9. linuxmodder (1)
  10. tflink (1)
  11. puiterwijk (0)
  12. pingou (0)
  13. abompard (0)


Generated by MeetBot 0.1.4.